Groundwater causes farthermost geotechnical bug in excavations such as sand running for well-nigh of construction projects such as tunneling. So, issues caused by footing water would increase construction budget and extend construction fourth dimension unless the basis h2o is properly controlled which is the root cause of the problems. There are two major methods for decision-making ground water including pumping technique and exclusion technique as shown in effigy-1.

Ground Water Control in Excavations by Exclusion

Fig.1: Ground H2o Control in Excavations by Exclusion

Methods of Ground Water Control in Excavations

Fig.2: Decision-making Ground Water in Shafts

Contents:

  • Methods of Basis Water Control in Excavations
  • Motivations or Reasons that Encourage the Utilization of Exclusion Methods to Command Ground H2o
  • Exclusion Methods to Control Ground Water in Excavations
    • Forming Impervious Barriers by Grouting with Cement, Clay Break or Bitumen
    • Chemic Consolidation for Controlling Basis Water in Excavation
    • Control Ground Water in Excavation by Compressed Air Method
    • Control of Ground H2o in Excavations past Freezing

Methods of Ground H2o Control in Excavations

  • Motivations or reasons that encourage the utilization of exclusion methods to command ground h2o in excavations
  • Exclusion methods used to command ground water in excavations

Motivations or Reasons that Encourage the Utilization of Exclusion Methods to Control Ground Water

In that location are cases in which the application of pumping techniques to command ground water is not recommended, for example, in water bearing rock formation and high permeability ground. This is because utilization of big capacity pumps, which are required for high permeability ground and formation of well points in rock formation would be considerably costly. Then, it would be economical to consider exclusion methods in the aforementioned situations and alike cases.

Exclusion Methods to Command Ground Water in Excavations

There are number of techniques by which footing water exclusion are obtained:

  • Forming impervious barriers by grouting with cement, clay suspension
  • Chemical consolidation for controlling ground h2o in earthworks
  • Ground water control by compressed air
  • Freezing ground water command

Forming Impervious Barriers past Grouting with Cement, Clay Suspension or Bitumen

This strategy is considered in h2o begetting stone germination or high permeability ground where the use of high pump capacity or digging well signal is expensive. In this technique, the permeability is reduced by creating an impervious barrier by injecting break material or fluids into the fissures of rocks or pore spaces. Fineness of fissures in rocks or soil particle size distribution would control types of materials used for grouting. This means that the grout material particle size should exist considerably smaller than the pore spaces. Figure-3 illustrates limiting particles sizes of materials which may exist grouted by different types of grout.

Various Types of Soils Which can be Grouted with Different Types of Grouting Material

Fig.iii: Diverse Types of Soils Which can exist Grouted with Dissimilar Types of Grouting Material

Additionally, groutability ratio, which is the ration betwixt D.15 size of soil to the D.85 size of grouting material particle, is also used to decide suitability of suspension grouts. So, suspension grouts would not be appropriate choice for the soil nether consideration unless the groutability ratio is higher than 5:15 for dirt grouts and 11:25 for cement grouts. Furthermore, it is necessary to pay attention to the quantity of materials used for grouting since it could be costly if the excessive amount is employed. This business might be dealt with by considering chemical grouts even though its cost is college than dirt and cement for the same quantity. As far as fluid gout is concerned, it is more effective than suspension grout since it fills all pores and spaces in soil whereas modest size pores would exist left empty in the case of break grout. When grouting technique is considered, it is required to practice great intendance regarding structures and facilities such as sewer sanitary organization around the grouting area. This is because grouting is conducted under swell pressure level, so it might impair considerable impairment to these facilities.

Distribution of Grouting Pipes Around Excavation Area

Fig.4: Distribution of Grouting Pipes Around Excavation Area

Finally, in that location are three major methods for injecting grouts which are provided in Table-one along their application conditions and procedures. Table-1: Principle Methods for Grout Injection

Grouting Methods Suitable Conditions Grouting Procedure
Open hole Very coarsely graded soils or rocks with wide fissures Firstly, grouting pipe, which its lower cease airtight by an expandable plug and upper end is sealed on the surface, is driven into the soil. Secondly, grout is forced into the pipage and driven out the plug and wide fissures volition be filled with grout.
Phase grouting Not specified In this method, a hole is drilled in accelerate and so a lance is inserted after that grouting is carried out by either bottom up method or peak down method. In the former, the pigsty is dug and a lance is inserted into the hole then grouting is proceeded. The latter approach, the upper role of the hole is grouted and after its setting, the lower part would be grouted.
Sleeve grouting Suitable for grouting soils It makes use of Tube-a-Manchette as shown in Figure-5. Later a hole is drilled to a determined depth and cased a sleeve tube is inserted and surrounded past partially plastic grout. And then, the case is pulled up and perforated injecting piping is inserted into the sleeve pipe. finally, the grouting cloth is injected and plastic grout would be broken and the grout fabric volition spread through the ground.

Tube-a-Manchette Used for Grouting in Soils

Fig.5: Tube-a-Manchette Used for Grouting in Soils

Chemical Consolidation for Controlling Ground H2o in Excavation

Chemic consolidation method is suitable for sandy gravels and fine grading sands. The nigh usual chemical material used for chemical consolidation is the sodium silicate. If the sodium silicate is mixed with other chemicals, moderately potent and insoluble silica gel tin can be produced. Two approaches have been practiced to deport chemical consolidation, namely, two shot procedure and one-shot process. Past and large, the latter process which is the most common one has replaced the former procedure. In ii shot process, two pipes with spacing of 50cm are forced into the ground, then sodium silicate are driven to one pipe and calcium silicate injected into the other while they are pulled upward gradually. Alternatively, one chemical is injected while the piping is driven into the ground, the other chemical material is driven though the piping every bit it is withdrawn. As far equally one-shot procedure is concerned, chemic grouts are ordinarily created prior the injection procedure. So, the most important consideration in this technique is to postpone the formation of grout gel. This is because grout penetration would be easier and more efficient when its viscosity is low.

Chemical Grout Formation prior to Injection

Fig.half-dozen: Chemical Grout Formation prior to Injection

Therefore, it is desired to have depression viscosity grout during injection and the increment in grout viscosity occurred after the completion of injection process. Finally, several attempts have been made to achieve gouts with such favored belongings, for example, resins and lignins and acrylic polymers.

Acrylic Polymers

Fig.7: Acrylic Polymers

Control Ground Water in Excavation by Compressed Air Method

There are several factors that motivate the application of compressed air to command ground h2o in excavations. For example, the use of other ground h2o command methods is not possible due to hydrological conditions. The use of compressed air is advised in the instance where ecology concerns are encountered specifically when ground water employed as a reservoir for drinkable h2o, consequently the utilize of solid materials like cement is prevented. Compressed air technique is commonly employed for controlling footing h2o in excavations of tunnels and shafts. Decision-making basis water past compressed air cannot exist carried out unless certain conditions are met. Firstly, the side walls and hat of the structure in which air is kept should be nearly impermeable. Secondly, compressed air static pressure shall be equal to the hydrostatic force per unit area of footing h2o at the lowest point of the to be maintained dry. Thirdly, air static pressure level throughout the unabridged dry hollow space of the structure is should be constant In lodge to reach the higher up weather, the following construction procedures should be considered.

  • Construct diaphragm wall as shown in Figure-8 along the side of the planned structure such as tunnel. The depth of the wall should extend below the final lesser slab of the structure.

Preparation for Compressed Air Technique to Control Groundwater

Fig.eight: Grooming for Compressed Air Technique to Command Groundwater, Diaphragm Wall Construction

  • Later on that, construct a chapeau for the tunnel and the joint betwixt the hat and diaphragm wall should exist compressed airtight. In this phase, preliminary drainage may be employed provided that the weather condition exercise not pose obstacles. It should be bore in mind that both diaphragm wall and the chapeau should be airtight too.
  • Construct a dividing wall or bulkhead with locks for workers and materials at 1 portal of the tunnel to avoid the escape of air toward the other end of the tunnel. Complementary momentary diaphragm wall might exist placed at specified spacing forth longitudinal axis of the tunnel and at its far end portal.
  • Configuring mechanical and electrical machineries for waste product disposal as shown in Effigy-ix, compressed air provision and supporting plant.

Removing Waste Materials from Excavations

Fig.9: Removing Waste Materials from Excavations

  • Finally, the excavation processes and compressed air utilization will be started nether the hat at the tunnel portal.

In this technique, substantial care should be practiced to prevent undesired events since compressed air techniques involves loftier level of hazard that could atomic number 82 to human loss.

Excavation and compressed air application

Fig.10: Earthworks and compressed air awarding, PFifty: air force per unit area height in the tunnel, Dtt: distance betwixt artesian ground h2o and invert WK: artesian Tithonian water pressure

Command of Basis Water in Excavations past Freezing

Controlling digging ground h2o by freezing is non recommended to employ unless all other methods fails to provide desired outcome or inappropriate to choose due to sure factors. This is considering the price of controlling ground h2o past freezing is significantly high due to large number of boreholes required to exist drilled around the earthworks area. However, at that place cases in which freezing is the only practical method to control ground water for example in extremely deep shaft excavation where the pressure of ground water is seriously high. To prevent the formation of unfrozen spaces in the frozen area, boreholes shall be exactly vertical and errors must be kept equally minimum as possible in addition to provide minor spacing between boreholes. Regarding disadvantages of freezing method, considerable time needed for the completion of drilling boreholes, installing plants, freezing grounds and certain types of soils might experience heaving. Added to that, compressed air operation is possible to hinder due to low temperature of excavation and construction activities such every bit concreting will confront difficulties. Nonetheless, it should be known that the about outstanding benefits of freezing technique is the constructive controlling of ground water which other methods are lacking. Freezing process involves drilling boreholes around excavation expanse, then inserting an outer plastic or steel tube with bore of 10-15cm and an inner tube of three.8-seven.5cm into the boreholes, the outer tube end is closed whereas the inner tube end is opened. The upper end of inner tube is connected to refrigeration institute from which cooled brine is pushed into the inner tube and after that returns to the refrigerator establish. The time during which the ground is frozen ranges between i to four months.

Controlling Ground Water in Excavation by Freezing Method

Fig.11: Controlling Ground H2o in Excavation by Freezing Method

Finally, it is recommended to apply liquid nitrogen rather than brine considering freezing time would be reduced considerably. One might fence that the liquid nitrogen is expensive only its low structure cost may offset that and it freezes the ground five times faster than case where alkali is used. Read More: Selection of Excavation Dewatering System for Construction Works Deep Well Systems For Dewatering of Excavations Sumps and Ditches for Dewatering of Excavations -Uses and Advantages Types of Excavation Supports or Globe Retaining Structures and their Applications